Data Center Setup: Cooling, Power and Physical Security Guide

Marta Teknoloji•January 25, 2025•9 min read

The data centre is the heart of enterprise IT operations, and when it is not designed properly even the most expensive hardware cannot run efficiently. Whether you are building a server room for 5 servers or a data centre with 50 racks, the same basic principles apply. In this guide we examine the critical components of data centre setup.

1. Physical Space Planning

Criteria to consider when choosing a data centre space:

  • Location: A structurally strong space with no flood risk and not on the ground floor (ideally the 1st or 2nd floor)
  • Floor loading: A full 42U rack weighs ~800-1000 kg. The floor must bear at least 1200 kg/m²
  • Raised floor: A 30-60 cm raised floor is recommended for cabling and cooling airflow
  • Ceiling height: A minimum clear height of 3m for the rack (2m) + cable tray + lighting
  • Room for growth: Plan for 30-50% more space than current needs

2. Rack Layout and Airflow

Racks should be arranged in a hot aisle / cold aisle layout:

  • Cold aisle: The fronts of the racks (the air intake side) face each other, and cold air is blown in from under the floor or from the ceiling
  • Hot aisle: The backs of the racks (the air exhaust side) face each other, and hot air is drawn upwards and expelled
  • Containment: Physically enclosing the hot or cold aisle (containment) increases energy efficiency by 20-30%
  • Aisle width: The cold aisle should be at least 1.2m wide and the hot aisle at least 1m

Unused U spaces in each rack should be closed with blanking panels — otherwise hot air recirculates and cooling efficiency drops.

3. Cooling System

For servers to run reliably, the ambient temperature should be kept at 18-27°C (ASHRAE recommendation) and the humidity at 40-60%. Cooling alternatives:

  • Precision air conditioning (Precision AC): In-row precision air conditioners such as Schneider InRow and Vertiv Liebert. They provide precise control of temperature and humidity
  • Split air conditioning: Cost-effective for small server rooms (3-5 racks). Two split units are sufficient for N+1 redundancy
  • In-Row cooling: Units placed within the rack rows cool hot air directly at its source — the most efficient method
  • Free Cooling: Cooling with natural air when the outdoor temperature is low — energy savings of up to 40%

Cooling capacity calculation: total IT load (kW) × 1.3 safety factor. For example, a 10 kW IT load requires a minimum of 13 kW of cooling capacity.

4. Power Infrastructure and UPS

Uninterruptible power supply planning is the most critical component of the data centre:

  • UPS topology: An online (double conversion) UPS should be preferred. It completely isolates mains fluctuations
  • N+1 redundancy: If the requirement is 20 kVA, 2 × 15 kVA UPS units (parallel redundant) should be installed
  • Battery runtime: A minimum of 15-20 minutes (sufficient until the generator kicks in) or 60-90 minutes if there is no generator
  • PDU: Power consumption should be monitored per rack with intelligent PDUs (metered/switched), with remote port management possible
  • Generator: Generator connection via an automatic transfer switch (ATS) that engages within 30 seconds

The earthing and lightning protection system should be installed under the supervision of an electrical engineer. A separate earthing line and an equipotential busbar should be used.

5. Cabling and Labelling

Data centre cabling requires a different discipline from standard office cabling:

  • Patch panel: Each rack should have a Cat6A patch panel, a fibre optic patch panel (LC/SC duplex) and a cable management panel
  • Cable pathways: Power and data cables should be routed separately under the raised floor or in an overhead cable tray system (to prevent EMI)
  • Fibre backbone: OS2 single-mode fibre should be used for connections between racks, and OM4 multimode fibre for switch-to-server connections
  • Labelling: Every cable, patch panel port and switch port should be labelled in accordance with the TIA-606 standard. QR code-based labelling makes maintenance easier

6. Physical Security

Access to the data centre should be under strict control:

  • Access control: A card access system + PIN or biometric (fingerprint) verification. All entries should be logged
  • CCTV: Entry points, corridors and rack rows recorded 24/7. Minimum 30-day archive
  • Fire detection: VESDA (Very Early Smoke Detection Apparatus) or aspirating smoke detection. Standard smoke detectors are insufficient
  • Fire suppression: An FM-200 or Novec 1230 gas suppression system. Water-based systems damage electronic equipment
  • Water detection: Water sensors should be placed under the raised floor so that leaks are detected early

7. Monitoring and Management

All infrastructure components should be monitored centrally with DCIM (Data Center Infrastructure Management) software:

  • Temperature and humidity sensors (front/back of each rack)
  • UPS battery status and load ratio
  • PDU power consumption (per rack and per port)
  • Air conditioner operating status and alarm notifications
  • Door open/close logs

Conclusion

A properly designed data centre directly determines the reliability and efficiency of the IT infrastructure. At Marta Teknoloji, we offer turnkey service at every stage of server room and data centre setup — from physical space planning to rack installation, from cabling test certification to UPS/generator integration.